Borrow it
- Anza Library
- Bayview/Linda Brooks-Burton Library
- Bernal Heights Library
- Bookmobiles / Mobile Outreach
- Chinatown/Him Mark Lai Library
- Eureka Valley/Harvey Milk Memorial Library
- Excelsior Library
- Glen Park Library
- Golden Gate Valley Library
- Ingleside Library
- Marina Library
- Merced Library
- Mission Bay Library
- Mission Library
- Noe Valley/Sally Brunn Library
- North Beach Library
- Ocean View Library
- Ortega Library
- Park Library
- Parkside Library
- Portola Library
- Potrero Library
- Presidio Library
- Richmond/Senator Milton Marks Library
- San Francisco Public Library
- Sunset Library
- Visitacion Valley Library
- West Portal Library
- Western Addition
The Resource Process for automated, safe MBE start and flux calibration, Stefan Svensson, (electronic resource)
Process for automated, safe MBE start and flux calibration, Stefan Svensson, (electronic resource)
Resource Information
The item Process for automated, safe MBE start and flux calibration, Stefan Svensson, (electronic resource) represents a specific, individual, material embodiment of a distinct intellectual or artistic creation found in San Francisco Public Library.This item is available to borrow from all library branches.
Resource Information
The item Process for automated, safe MBE start and flux calibration, Stefan Svensson, (electronic resource) represents a specific, individual, material embodiment of a distinct intellectual or artistic creation found in San Francisco Public Library.
This item is available to borrow from all library branches.
- Summary
- A command procedure has been developed for the U.S. Army Research Laboratory (ARL) molecular beam epitaxy (MBE) computer control system that allows a user to set up the system for an automated, unattended start each morning. The automated sequence consists of- 1. A system safety check to determine if cell ramping should be allowed. 2. A cell temperature ramp to an outgassing temperature. 3. An outgassing of cells. 4. A ramp-down of cells to nominal operating temperatures. 5. An automated setup through an iterative process of flux measurements and changes of temperatures until desired targets are reached. This command procedure allows a daily, safe start-up of the MBE system and generates identical flux settings that improve the crystal growth reproducibility. Typically, one can save two hours or more of a work day by using this automated procedure
- Language
- eng
- Extent
- 1 online resource (iii, 27 p.)
- Note
-
- Title from title screen (viewed on Feb. 3, 2011)
- "February 2001."
- Label
- Process for automated, safe MBE start and flux calibration
- Title
- Process for automated, safe MBE start and flux calibration
- Statement of responsibility
- Stefan Svensson
- Title variation
- Process for automated, safe molecular beam epitaxy start and flux calibration
- Language
- eng
- Summary
- A command procedure has been developed for the U.S. Army Research Laboratory (ARL) molecular beam epitaxy (MBE) computer control system that allows a user to set up the system for an automated, unattended start each morning. The automated sequence consists of- 1. A system safety check to determine if cell ramping should be allowed. 2. A cell temperature ramp to an outgassing temperature. 3. An outgassing of cells. 4. A ramp-down of cells to nominal operating temperatures. 5. An automated setup through an iterative process of flux measurements and changes of temperatures until desired targets are reached. This command procedure allows a daily, safe start-up of the MBE system and generates identical flux settings that improve the crystal growth reproducibility. Typically, one can save two hours or more of a work day by using this automated procedure
- Cataloging source
- DTICE
- http://library.link/vocab/creatorName
- Svensson, Stefan P
- Funding information
- AMSRL-SE-RL
- Government publication
- federal national government publication
- Illustrations
- illustrations
- Index
- no index present
- Literary form
- non fiction
- Nature of contents
-
- dictionaries
- technical reports
- Period covered
- January-June 2000.
- http://library.link/vocab/relatedWorkOrContributorName
- U.S. Army Research Laboratory
- Series statement
- ARL-TR
- Series volume
- 2361
- http://library.link/vocab/subjectName
-
- Molecular beam epitaxy
- SDL (Computer program language)
- Computer Hardware
- Atomic and molecular physics and spectroscopy
- Computers
- Molecular beam epitaxy
- Control systems
- Automation
- User needs
- Calibration
- Type of report
- Final;
- Label
- Process for automated, safe MBE start and flux calibration, Stefan Svensson, (electronic resource)
- Note
-
- Title from title screen (viewed on Feb. 3, 2011)
- "February 2001."
- Carrier category
- online resource
- Carrier category code
-
- cr
- Carrier MARC source
- rdacarrier
- Color
- black and white
- Content category
- text
- Content type code
-
- txt
- Content type MARC source
- rdacontent
- Dimensions
- unknown
- Extent
- 1 online resource (iii, 27 p.)
- Form of item
- online
- Governing access note
- Approved for public release
- Media category
- computer
- Media MARC source
- rdamedia
- Media type code
-
- c
- Other physical details
- ill.
- Specific material designation
- remote
- Label
- Process for automated, safe MBE start and flux calibration, Stefan Svensson, (electronic resource)
- Note
-
- Title from title screen (viewed on Feb. 3, 2011)
- "February 2001."
- Carrier category
- online resource
- Carrier category code
-
- cr
- Carrier MARC source
- rdacarrier
- Color
- black and white
- Content category
- text
- Content type code
-
- txt
- Content type MARC source
- rdacontent
- Dimensions
- unknown
- Extent
- 1 online resource (iii, 27 p.)
- Form of item
- online
- Governing access note
- Approved for public release
- Media category
- computer
- Media MARC source
- rdamedia
- Media type code
-
- c
- Other physical details
- ill.
- Specific material designation
- remote
Library Locations
-
-
Bayview/Linda Brooks-Burton LibraryBorrow it5075 3rd Street, San Francisco, CA, 94124, US37.732534 -122.391121
-
Bernal Heights LibraryBorrow it500 Cortland Avenue, San Francisco, CA, 94110, US37.738862 -122.416132
-
Bookmobiles / Mobile OutreachBorrow itSan Francisco, CA, US
-
Chinatown/Him Mark Lai LibraryBorrow it1135 Powell Street, San Francisco, CA, 94108, US37.795248 -122.410239
-
Eureka Valley/Harvey Milk Memorial LibraryBorrow it1 Jose Sarria Court, San Francisco, CA, 94114, US37.764084 -122.431821
-
-
-
Golden Gate Valley LibraryBorrow it1801 Green Street, San Francisco, CA, 94123, US37.797819 -122.428950
-
-
-
-
-
-
Noe Valley/Sally Brunn LibraryBorrow it451 Jersey Street, San Francisco, CA, 94114, US37.750180 -122.435116
-
North Beach LibraryBorrow it850 Columbus Avenue, San Francisco, CA, 94133, US37.802585 -122.413280
-
-
-
-
-
-
-
Presidio LibraryBorrow it3150 Sacramento Street, San Francisco, CA, 94115, US37.788875 -122.444892
-
Richmond/Senator Milton Marks LibraryBorrow it351 9th Ave, San Francisco, CA, 94118, US37.781855 -122.468054
-
San Francisco Public LibraryBorrow it100 Larkin Street, San Francisco, CA, 94102, US37.779376 -122.415795
-
-
Visitacion Valley LibraryBorrow it201 Leland Avenue, San Francisco, CA, 94134, US37.712695 -122.407913
-
-
Embed
Settings
Select options that apply then copy and paste the RDF/HTML data fragment to include in your application
Embed this data in a secure (HTTPS) page:
Layout options:
Include data citation:
<div class="citation" vocab="http://schema.org/"><i class="fa fa-external-link-square fa-fw"></i> Data from <span resource="http://link.sfpl.org/portal/Process-for-automated-safe-MBE-start-and-flux/J0vexE5FdjI/" typeof="Book http://bibfra.me/vocab/lite/Item"><span property="name http://bibfra.me/vocab/lite/label"><a href="http://link.sfpl.org/portal/Process-for-automated-safe-MBE-start-and-flux/J0vexE5FdjI/">Process for automated, safe MBE start and flux calibration, Stefan Svensson, (electronic resource)</a></span> - <span property="potentialAction" typeOf="OrganizeAction"><span property="agent" typeof="LibrarySystem http://library.link/vocab/LibrarySystem" resource="http://link.sfpl.org/"><span property="name http://bibfra.me/vocab/lite/label"><a property="url" href="http://link.sfpl.org/">San Francisco Public Library</a></span></span></span></span></div>
Note: Adjust the width and height settings defined in the RDF/HTML code fragment to best match your requirements
Preview
Cite Data - Experimental
Data Citation of the Item Process for automated, safe MBE start and flux calibration, Stefan Svensson, (electronic resource)
Copy and paste the following RDF/HTML data fragment to cite this resource
<div class="citation" vocab="http://schema.org/"><i class="fa fa-external-link-square fa-fw"></i> Data from <span resource="http://link.sfpl.org/portal/Process-for-automated-safe-MBE-start-and-flux/J0vexE5FdjI/" typeof="Book http://bibfra.me/vocab/lite/Item"><span property="name http://bibfra.me/vocab/lite/label"><a href="http://link.sfpl.org/portal/Process-for-automated-safe-MBE-start-and-flux/J0vexE5FdjI/">Process for automated, safe MBE start and flux calibration, Stefan Svensson, (electronic resource)</a></span> - <span property="potentialAction" typeOf="OrganizeAction"><span property="agent" typeof="LibrarySystem http://library.link/vocab/LibrarySystem" resource="http://link.sfpl.org/"><span property="name http://bibfra.me/vocab/lite/label"><a property="url" href="http://link.sfpl.org/">San Francisco Public Library</a></span></span></span></span></div>